Progressive Design-Build vs Traditional Design-Build
How progressive design-build works: two-phase contracting, open-book pricing, what the owner can do if the Phase 2 price is rejected, and who owns the design work product.
Read guide2 guides with this tag.
How progressive design-build works: two-phase contracting, open-book pricing, what the owner can do if the Phase 2 price is rejected, and who owns the design work product.
Read guide
A practical comparison of contracts, pricing, programme, design control, risk, and published performance research for design-build and design-bid-build.
Read guide