Guaranteed Maximum Price Contract: Contingency
A guaranteed maximum price caps the cost of the work plus the fee. Contingency control and shared savings follow the instrument.
Read guidePlanning, delivery, cost, and material guidance for design-build projects.
A guaranteed maximum price caps the cost of the work plus the fee. Contingency control and shared savings follow the instrument.
Read guide
Compare hiring a design-builder versus an independent architect across responsible control, stamp boundaries, contract scope menus, owner advisors, and fees.
Read guide
Structure a commercial building cost estimator worksheet around core and shell, tenant improvement, and sitework scope, area denominators, and location factors.
Read guide
Track budget control in construction projects with a budget vs. actual template, commitment reconciliation, and an EAC forecast review.
Read guide
Review stipulated sum allowances and contingency, accepted alternates, allowance reconciliation, and the questions to ask before approving a budget.
Read guide
Match AIA contract documents to conventional delivery, CMc, CMa and design-build. Compare A201, A133 and A141, architect agreements and pricing choices.
Read guideBuild a master construction schedule in Excel that tracks CPM logic, total float, IBC 107.3.3 phased permits, utility transformer lead times, and TCO gates.
Read guideBuild a residential cost-per-square-foot estimate from dated local prices, measured quantities and explicit scope. Includes a copyable estimate worksheet.
Read guide
The preconstruction manager's job is the running set of estimates, value-engineering records, and bid-package boundaries, not the meeting agenda.
Read guide
An EPC contractor selection fails when a 300 MW test is copied onto the wrong plant, or left blank. The 2017 Rupsha invitation prints 325 million USD and two 300 MW contracts.
Read guide
A construction budget fails when a screening figure is treated as authorization. On a base of 100, the wider Class 5 ends are 50 and 200. The wider Class 3 ends are 80 and 130.
Read guide
Compare design-build firms with an interview evidence matrix: verify licenses with local boards, check team roles, compare proposals and spot contract red flags.
Read guide