Guaranteed Maximum Price Contract: Contingency
A guaranteed maximum price caps the cost of the work plus the fee. Contingency control and shared savings follow the instrument.
Read guideStart with the current budget guide to separate construction costs, owner costs and uncertainty.
Review budget components, estimate maturity and cost decisions at design checkpoints.
8 guides in this topic.
A guaranteed maximum price caps the cost of the work plus the fee. Contingency control and shared savings follow the instrument.
Read guide
Structure a commercial building cost estimator worksheet around core and shell, tenant improvement, and sitework scope, area denominators, and location factors.
Read guide
Track budget control in construction projects with a budget vs. actual template, commitment reconciliation, and an EAC forecast review.
Read guide
Review stipulated sum allowances and contingency, accepted alternates, allowance reconciliation, and the questions to ask before approving a budget.
Read guideBuild a residential cost-per-square-foot estimate from dated local prices, measured quantities and explicit scope. Includes a copyable estimate worksheet.
Read guide
A construction budget fails when a screening figure is treated as authorization. On a base of 100, the wider Class 5 ends are 50 and 200. The wider Class 3 ends are 80 and 130.
Read guide
Read the NAHB 2024 survey by denominator: sales price versus construction cost, fees already inside site work, and a blank cell for the quote.
Read guide
What a construction budget should include, how estimates mature with design, and how to manage cost at each design checkpoint before commitments are made.
Read guideFor a process-industry estimate, class the estimate before treating the total as a budget, and map each work package to the master construction schedule and critical path. After reviewing the budget, use Project Planning’s risk checklist to assign responsibility for unresolved items.